Friday 26 December 2014

:D

Forgot to do an update!

Our SS rectified the problem, it looks alot better! 

It was about 10cm out..

Our ducted heating control has been installed and so have our kitchen powerpoints.. But the island bench Powerpoint still hasn't been put in!


And our site supervisor is the best! Look at what he's done for over the holidays..


Our blinds have been put in. They're a lot whiter then what we thought!

And cannot wait for our 70" tv we bought today to be against this wall!


So the house is all locked up, alarms on, present given to our SS, and won't be seeing him until 5th of jan. Soo cannot wait to be in! He said the 3rd or 4th week of jan :) 1 month left!! Just need our floors!

Thursday 18 December 2014

Bit of this bit of that

Carpet! The carpenter was nice & let us look around, first time we've talked to a tradie on site! He was there at like 7pm 😳


-main bedroom

-theatre

-2nd bedroom

-hallway

-3rd bedroom


-4th bedroom


Aanndddd! I got a photo of our bath! The wall tiles look awesome here, I dunno why they look crap in the kitchen 😞



Temp fence still hasn't come down, thank goodness! Need to sort out our fences which is proving difficult this time of the year! 

So next is driveway & blinds on tomorrow, which they've already prepped the driveway :)

- it looks like they've positioned our driveway wrong (I'm hoping), so paul is gunna go down tomorrow to have a look..

Oh and our garage door was down!

And our gas meter is in

And portaloo gone

So hopefully we'll have some updates tomorrow :)


Thursday 11 December 2014

Oh Jeez, Oh Jeez, Oh Jeez!

SO!

We had a walkthrough with our SS today. Wow!

- sinks

-😆👍

-ensuite shower

-linen

-pantry

-kitchen

- HATE the tiles!

-space for fridge, looks so small 😞

- woo! Main toilet, or as jon said to the SS, look we have a shitter 😒

-main bathroom

-looovvveeeee this

But so shattered! In all the excitement i forgot to take a photo of the bath!


-robe doors

-hallway


Okay SO!

Freaking out a little!


Garage door goes on tomorrow

Temp fence and toilet goes on Tuesday

The sealing tile stuff gets done Tuesday

Carpets go in Wednesday

Driveway and blinds go in next Friday


SS tried to book in the timber laminate floors for the 12th of jan but they knocked it back, so he said we will do PCI without floors and when we do handover we will have floors.. 


The people behind us have handover next Friday, so he's going to ask them for their fence guys number and im going to call them to see if they can do it all in one hit..


Stressed! 😓

Tuesday 9 December 2014

Not long now

So we thought after the tiles were done that was is until after xmas break, well we were wrong! 
They've installed our sinks and done the fittings to all the doors, I cannot wait to have another walk through to see the bathrooms properly! But here is what I could take pics of 


Kitchen sink! & they've taken the benchtop cover off
Door handles
Sinks

And no more goop on windows!

All I can say is cannot wait for our walk through!
So checklist of what's left
Mirrors & shower screens
Shelving and robe shelves
Robe doors
Timber laminate floors & carpet
Garage door
Driveway
& front door to be painted..